Literature on Reviewing Groundwater Models
Prepared for the MODFLOW Model Reviewer (modflow_reviewer) · baseline survey November 6, 2026 · built 2026-11-16 · last monthly addition 2026-11-16
Summary. The review literature agrees on a core that the reviewer already covers well: convergence, global and cell-by-cell mass balance, grid and layer geometry, boundary placement, and calibration statistics with residual maps. The five high-priority gaps found by the baseline survey (residual normality, bias and correlation tests, a boundary-flux inventory, initial-condition drift and transport grid numbers) were added to the reviewer on November 6, 2026. The main remaining gap is everything that needs PEST or PEST++ files: weights, sensitivities, identifiability and forecast uncertainty. Since about 2010 the literature has moved from "how well does the model fit" towards "how uncertain are the forecasts", so forecast-uncertainty checks are where most new USGS and journal work appears.
27USGS reports and methods
61journal articles
33guidelines and standards
14candidate new checks
Contents
- New this month
- Techniques and reviewer coverage
- Candidate new checks
- How this survey was done
- Bibliography
New this month
7 item(s) added by the monthly update in the last 35 days:
Pleasants, M.S.; Fienen, M.N.; Essaid, H.I.; and others (2026). A demonstrated workflow to efficiently identify better performing process-based model configurations. Water Resources Research, 62(11), e2026WR044356. doi:10.1029/2026wr044356 new
USGS-led study that screens competing model configurations before calibration by comparing prior-ensemble outputs with observed data using a Mahalanobis-distance prior-data-conflict metric that also penalizes complexity; demonstrated on 96 PRMS configurations and confirmed with PEST++ IES calibration. Transferable to choosing among alternative MODFLOW conceptualizations.
For the reviewer: From a PEST++ prior ensemble (as few as about 25 realizations), compute Mahalanobis distance of observations from the prior output distribution per observation group and flag prior-data conflict before calibration
Ou, G.; Wang, Z. (2026). makePst: a reproducible and auditable spreadsheet workflow for PEST model calibration. Groundwater, early view, article gwat.70118. doi:10.1111/gwat.70118 new
Command-line tool that builds and validates PEST-family control files from spreadsheet calibration records, compares control files semantically, tracks provenance and writes calibration results back to the workbook.
For the reviewer: Validate the PEST control file (parameter bounds, groups, observation weights) and diff it against an earlier archived version as an audit trail
Afzal, N.; Zwickle, A.; Zipper, S.; Wardropper, C.B. (2026). Trust, uncertainty, and the use of groundwater models in the Southern High Plains Aquifer (USA). Groundwater, early view, article gwat.70127. doi:10.1111/gwat.70127 new
Interview study of producers, policy staff and modellers using a Kansas groundwater management model; trust in both model and modeller drives use, and users want transparent statements of uncertainty and limitations.
For the reviewer: Check that the report has an explicit limitations and uncertainty section written for non-specialist users
Tian, J.; Zeng, X.; Pan, Y.; and others (2026). A data-driven method coupling multiple physical constraints for correcting structural errors in groundwater contaminant transport models. Hydrology and Earth System Sciences, 30(20), 6459-6479. doi:10.5194/hess-30-6459-2026 new
Proposes a data-driven correction for structural error in reactive transport models that combines several physical constraints in a weighted likelihood; constraints act like extra observations and reduce parameter compensation and predictive uncertainty.
For the reviewer: judgment (supports a check that transport-model residuals are examined for systematic structural bias before parameters are trusted)
Schmid, W.; Dela Cruz, A.; Siade, A.; and others (2026). Managed aquifer recharge operations and design under hydrologic uncertainty. Groundwater, early view, article gwat.70105. doi:10.1111/gwat.70105 new
Uses a dual ensemble (operating scenarios crossed with IES parameter realizations) to express managed-recharge impacts as probabilities of exceeding stakeholder thresholds; climate scenario dominated predictive uncertainty.
For the reviewer: From IES ensemble outputs, report the probability that each forecast exceeds its stated decision threshold, and flag scenarios evaluated on a single realization
Li, W.; He, C.; Sun, H.; and others (2026). Groundwater recovery targets and the identifiability of irreversible compaction in layered aquitards. Sustainability, 18(22), 11604. doi:10.3390/su182211604 new
Synthetic tests (3000 fits) and a field case show that net extensometer data poorly identify which aquitard layer compacts irreversibly; initial-state and storage parameters compensate, giving different forecasts at similar calibration fit.
For the reviewer: For SUB/CSUB models, flag high correlation between preconsolidation head and inelastic storage parameters and recommend layer-specific deformation observations
Bai, Y.; Li, Z.; Ru, Q.; and others (2026). Uncertainty analysis of elevation data based on groundwater modeling system: a case study of Zhaozhou County, China. Journal of Groundwater Science and Engineering, 14(4), 582-600. doi:10.26599/jgse.2026.9280096 new
Compares model top surfaces from a DEM and from sparse borehole interpolation; smoothed borehole surfaces distorted unsaturated thickness and cut simulated evapotranspiration by up to 93 percent, while both models still passed conventional head-fit criteria.
For the reviewer: Compare model top with a DEM and flag large differences, especially where ET or drains depend on depth below land surface; report NSE as well as RMSE
Techniques and reviewer coverage
Each row is a review technique that the sources recommend. The source count is the number of publications tagged with it; the key sources are the most-cited or most direct ones.
| Technique | What the literature asks for | Reviewer status | Sources | Key sources |
|---|---|---|---|---|
| Review checklists and frameworks | Review the model against its stated objectives with a structured checklist (SIR 2004-5038, AGMG, ASTM, NZ audit guide, EPA frameworks). | Partly The report includes the SIR 2004-5038 reviewer questions; other checklists are not encoded. | 25 | Reilly 2004, Halford 2019, USGS Office of Groundwater 2016, USGS Office of Groundwater 2016, USGS Office of Groundwater n.d. |
| Conceptual model | Test the conceptual model and alternatives; most prediction failures come from conceptual errors, not parameter values. | Partly Ill-posed models, budget composition and recharge-versus-discharge are checked; alternative conceptual models need judgment. | 42 | Reilly 2004, Poeter 2007, Reilly 2001, Franke 1987, Halford 2019 |
| Grid, layers and time steps | Grid and time steps fine enough for the processes; Peclet and Courant limits for transport; layers thin enough for vertical gradients. | Implemented Thin layers, grid-spacing ratio, time-step counts, and transport grid Peclet and Courant numbers (USG-T, MF6 GWT). | 12 | Reilly 2004, Harbaugh 2005, Langevin 2017, Niswonger 2011, Leake 1999 |
| Boundary and initial conditions | Boundaries placed and typed so they do not control the answer; specified heads away from stresses; transient runs start from consistent heads. | Implemented Duplicate BCs, conductance, BC placement, boundary flux inventory by type, source of water to wells, specified heads near wells, and initial-condition drift. | 14 | Reilly 2004, Reilly 2001, Franke 1987, Harbaugh 2005, Langevin 2017 |
| Solver and mass balance | Converged solution, small global and local budget errors, closure criteria consistent with cell flows. | Implemented Global and cell-by-cell mass balance, solver hit locations and solver advice (checks 6, 7, 8, 11). | 10 | Reilly 2004, Harbaugh 2005, Langevin 2017, Niswonger 2011, Waterlines Report Series No. 82 |
| Calibration statistics | ME, MAE, RMS, scaled RMS, weighted statistics, simulated-versus-observed plots, by layer and target type. | Implemented All five GWV target types with ME, MAE, SD, RMS and range-scaled values by layer; weighted statistics are not computed. | 45 | Reilly 2004, Hill 1998, Hill 2000, Poeter 2005, Hill 1994 |
| Residual patterns | Residual maps and tests of bias, normality and spatial or temporal correlation of residuals. | Implemented Residual maps, normality (R2N), bias trend, Moran's I clustering and runs tests through time. | 10 | Reilly 2004, Hill 1998, Hill 2000, Poeter 2005, Hill 1994 |
| Observations and weights | Targets located correctly; weights based on measurement error; observation groups balanced. | Partly Targets in inactive or dry cells are flagged; weights are not reviewed. | 20 | Hill 1998, Hill 2000, Poeter 2005, Tonkin 2007, Doherty 2010 |
| Sensitivity and identifiability | Composite scaled sensitivities, parameter correlation, identifiability, leverage; avoid one-at-a-time analysis only. | Not yet Not reviewed. Needs a PEST Jacobian (.jco) or perturbation runs. | 27 | Hill 1998, Hill 2000, Poeter 2005, Cooley 1990, Tonkin 2007 |
| Prediction uncertainty | Report forecasts with uncertainty (FOSM, ensembles), state prediction stresses, check data worth. | Not yet Not reviewed. Needs PEST/PEST++ files and named forecasts. | 51 | Hill 1998, Poeter 2005, Hill 1994, Cooley 1990, Christensen 2006 |
| Complexity and parsimony | Justify model complexity; compare parameters with observations; regularize highly parameterized models. | Not yet Only the per-layer property summary; parameter counts and regularization are not reviewed. | 25 | Hill 1998, Poeter 2007, Doherty 2010, Doherty 2011, Waterlines Report Series No. 82 |
| Documentation and archiving | Archive inputs, outputs, executables, scripts and metadata so the model can be rerun and audited. | Partly Packages, versions, load failures and unsupported packages are listed; archive completeness is not checked. | 40 | Reilly 2004, Winston 2018, USGS Office of Groundwater 2016, USGS Office of Groundwater 2016, USGS Office of Groundwater n.d. |
| Post-audit | Compare earlier predictions with later observations; keep dated forecasts for future audits. | Not yet Not reviewed. | 12 | Hanson 1996, doi:10.17226/11972, California State Water Resources Control Board web , Konikow 1992, Bredehoeft 2005 |
Candidate new checks
Ordered by value for effort. "High" checks need only files the reviewer already reads. The PEST-based checks would run only when PEST files are found next to the model.
| Priority | Check | Inputs | Effort | Sources |
|---|---|---|---|---|
| Implemented 2026-11-06 | Residual autocorrelation and runs test Moran's I of head residuals in map view (per layer) and lag-1 autocorrelation or a runs test for transient targets. Clustered residuals point to structural or conceptual error rather than noise. | Target residual CSV files the reviewer already reads | Low | Hill 1998, Doherty 2010, Poeter 2005, ASTM D5490-93(2014)e1 |
| Implemented 2026-11-06 | Residual normality and bias plots Normal-probability plot of residuals with its correlation coefficient (R2N), and residual against simulated value to show bias that depends on head. | Target residual CSV files | Low | Hill 1994, Poeter 2005, Hill 1998 |
| Implemented 2026-11-06 | Boundary inventory and flux share Table of each boundary package with its mathematical type (specified head, specified flux, head-dependent), inflow and outflow totals and share of the budget. Flags specified-head or GHB cells close to pumping wells that supply most of the induced inflow. | Model input and budget file (already read) | Medium | Reilly 2001, Franke 1987, Jazayeri 2019, ASTM D5609-16 |
| Implemented 2026-11-06 | Initial-condition drift For transient models, compares the head change and storage flux in the first stress period with later periods. A large early change suggests starting heads that are not in equilibrium with the first-period stresses. | Head and budget files | Low | Franke 1987, ASTM D5610-94(2014) |
| Implemented 2026-11-06 | Transport Peclet and Courant numbers For USG-Transport, GWT and MT3D models, computes grid Peclet number (cell size / dispersivity) and Courant number (velocity x time step / cell size) from the flow budget and flags Pe > 2 and Cr > 1. | BCT/DSP inputs, porosity, cell-by-cell flows | Medium | Konikow 2011, EA report NC/99/38/2 |
| Medium | Prediction-stress extrapolation Compares pumping and recharge rates in user-designated prediction periods with the range used in the calibration periods and flags stresses outside that range. | Stress-period inputs plus a --calib-periods option | Medium | Konikow 1986, Anderson 1992, Waterlines Report Series No. 82 |
| Medium | Layer thickness versus well screens and stream beds Flags layers much thicker than the screened interval of MNW wells or the stream-bed depth where vertical gradients matter for the forecast. | MNW1/MNW2 screens, SFR/RIV bed elevations, layer geometry | Medium | White 2020 |
| Medium | PEST control and record file review Reads the .pst and .rec files: objective-function share by observation group, parameters at bounds, whether regularization is used, uniform weights and implied measurement error (1/weight) compared with plausible error. | PEST .pst and .rec files | Medium | Doherty 2010, Hill 2002, Post 2013, ASTM D5981/D5981M-18, Fienen 2024 |
| Medium | Jacobian diagnostics From a PEST .jco: composite scaled sensitivities, parameter correlation (|r| > 0.95), identifiability (< 0.1) and leverage or Cook's D for influential targets. | PEST .jco and .pst files | Medium | Hill 1998, Doherty 2009, Hill 2016, Poeter 2005 |
| Medium | PEST++ IES ensemble diagnostics Objective-function history, ensemble spread from prior to posterior, ensemble collapse and prior-data conflict flags. | PEST++ IES output CSV files | Medium | White 2020, Farnum 2025, Fienen 2024 |
| Low | Forecast uncertainty and data worth (FOSM) When a Jacobian and named forecasts exist, computes prior and posterior forecast variance and ranks observation groups by data worth, for example with pyEMU. | PEST .jco, .pst, named forecasts; pyEMU | High | White 2016, Fienen 2010, Dausman 2010, Moore 2005 |
| Low | Archive completeness Checks the model folder for inputs, outputs, listing files, executable versions, scripts and a readme, using the USGS model-archive layout (historical reference) and ASTM D5718 as the list. | Model folder contents | Low | Winston 2018, ASTM D5718-13, Texas Water Development Board 2020 |
| Low | Assumptions register Lists assumptions the reviewer can see in the files (steady state, uniform parameters, boundary types, no-flow edges) as a table for the modeller to annotate. | Model input (already read) | Low | Peeters 2017, Refsgaard 2007 |
| Low | More fit metrics Adds Nash-Sutcliffe efficiency and bias by zone, and reports heads, flows and hydrographs separately rather than as one objective function. | Target residual CSV files | Low | Bennett 2013, Gupta 2012 |
Left to the reviewer's judgment
- Whether the objectives are stated and the model is fit for them (Reilly and Harbaugh 2004; EPA 2009).
- Alternative conceptual models and model averaging (Bredehoeft 2003; Rojas 2008).
- Calling a model "validated" (Konikow and Bredehoeft 1992); this needs the report text, which the reviewer does not read.
- Whether the complexity matches the decision (Hunt 2007; Guthke 2017; Doherty and Moore 2020).
How this survey was done
- USGS publications were found with the USGS Publications Warehouse API and checked against their pubs.usgs.gov records. Journal articles were found with Crossref and OpenAlex searches (Groundwater, Hydrogeology Journal, Water Resources Research, Journal of Hydrology, Environmental Modelling & Software, Advances in Water Resources and others) and each DOI was resolved through Crossref. Guidelines were checked on the issuing agency's site or an archived copy.
- Citation counts are OpenAlex values on the search date and are only a rough guide to influence.
- Summaries are based on abstracts and agency pages; full texts were not parsed. Items marked "abstract only" are behind a paywall.
Limits. ASTM standards are paid, and all D18.21 modelling guides except D5981 (calibration, active) are now withdrawn, so they are listed for their content, not as current requirements. The USGS Office of Groundwater model-archiving policy (Technical Memorandum 2016.02) has been rescinded and is kept on the USGS site as historical reference only. Conference papers, theses and non-English guidance other than the Dutch GMP handbook were not searched.
Data files: literature\sources_usgs.txt, sources_journal.txt, sources_guides.txt; this page is rebuilt with python literature\build_literature_report.py.
Bibliography
USGS reports and methods (27)
Franke, O.L., Reilly, T.E., and Bennett, G.D. (1987). Definition of boundary and initial conditions in the analysis of saturated ground-water flow systems: an introduction. TWRI 3-B5. doi:10.3133/twri03b5
Describes seven common boundary condition types and common mistakes in specifying initial conditions, including in transient and drawdown simulations.
For the reviewer: Check transient initial heads are from a consistent steady state; flag boundaries near stresses
Cooley, R.L., and Naff, R.L. (1990). Regression modeling of ground-water flow. TWRI 3-B4. doi:10.3133/twri03b4
Foundational USGS treatment of nonlinear regression for groundwater models, including residual analysis, model error testing, and confidence/prediction intervals.
For the reviewer: Statistical basis for residual and interval checks; mostly reference/judgment
Hill, M.C. (1994). Five computer programs for testing weighted residuals and calculating linear confidence and prediction intervals on results from MODFLOWP. OFR 93-481. doi:10.3133/ofr93481
Programs and theory for testing whether weighted residuals are independent and normally distributed, plus Beale's linearity measure and linear confidence/prediction intervals.
For the reviewer: Automate normality (R2N) and independence tests of weighted residuals; compute linearity measure where Jacobian available
Hanson, R.T. (1996). Postaudit of head and transmissivity estimates and ground-water flow models of Avra Valley, Arizona. WRIR 96-4045. doi:10.3133/wri964045
Post-audit comparing earlier model predictions and transmissivity estimates with later observed heads to identify sources of predictive error.
For the reviewer: Post-audit module: compare archived forecasts with later observations; summarize bias
Hill, M.C. (1998). Methods and guidelines for effective model calibration (with application to UCODE and MODFLOWP). WRIR 98-4005. doi:10.3133/wri984005
The 14 calibration guidelines: parsimony, observation weighting, composite/dimensionless scaled sensitivities, parameter correlation, weighted-residual analysis, and evaluating prediction uncertainty.
For the reviewer: Compute weighted residual stats, CSS/DSS, parameter correlation >0.95 flags, runs test on residuals; flag weights not tied to measurement error
Leake, S.A., and Claar, D.V. (1999). Procedures and computer programs for telescopic mesh refinement using MODFLOW. OFR 99-238. doi:10.3133/ofr99238
Procedures for building inset (child) models whose boundary conditions come from a regional parent model.
For the reviewer: Compare inset-model boundary heads/fluxes to parent model; flag mismatch
Hill, M.C., Banta, E.R., Harbaugh, A.W., and others (2000). MODFLOW-2000 user guide to the Observation, Sensitivity, and Parameter-Estimation Processes and three post-processing programs. OFR 2000-184. doi:10.3133/ofr00184
Defines MODFLOW observation types (heads, flows, advective transport), weighted least-squares fit statistics, sensitivities, and post-processors for residual and parameter-statistics analysis.
For the reviewer: Parse OBS/HOB-style outputs; compute weighted SSE, error variance, fitted standard error; plot weighted residuals vs simulated values
Reilly, T.E. (2001). System and boundary conceptualization in ground-water flow simulation. TWRI 3-B8. doi:10.3133/twri03b8
Explains how to conceptualize where water enters and leaves a system and how boundary type choice (specified head/flux, head-dependent) affects simulated response.
For the reviewer: Inventory boundary types/fluxes; flag specified-head boundaries supplying large share of pumping-induced inflow
Reilly, T.E., and Harbaugh, A.W. (2004). Guidelines for evaluating ground-water flow models. SIR 2004-5038. doi:10.3133/sir20045038
Reviewer-focused guidance: judge a model against its stated objectives, then check conceptualization, grid and time steps, boundaries, budget closure, calibration fit and residual patterns, and how well it is documented.
For the reviewer: Use as the master checklist: report % budget discrepancy, boundary inventory, residual stats and maps, and flags for missing objectives/documentation
Harbaugh, A.W. (2005). MODFLOW-2005, the U.S. Geological Survey modular ground-water model: the ground-water flow process. TM 6-A16. doi:10.3133/tm6a16
Reference documentation for the MODFLOW-2005 equations, packages, volumetric budget, and solver convergence criteria.
For the reviewer: Parse LST budget: percent discrepancy per stress period/time step, convergence failures, solver closure values
Poeter, E.P., Hill, M.C., Banta, E.R., and others (2005). UCODE_2005 and six other computer codes for universal sensitivity analysis, calibration, and uncertainty evaluation constructed using the JUPITER API. TM 6-A11. doi:10.3133/tm6a11
Model-independent code plus post-processors producing sensitivity statistics (CSS, DSS, leverage, Cook's D, DFBETAS), residual normality tests and linear/nonlinear intervals.
For the reviewer: Replicate key diagnostics: leverage/Cook's D for influential observations, normal probability plot correlation (R2N) of weighted residuals
Christensen, S., and Cooley, R.L. (2006). User guide to the UNC process and three utility programs for computation of nonlinear confidence and prediction intervals using MODFLOW-2000. TM 6-A10. doi:10.3133/tm6a10
MODFLOW-2000 process for computing nonlinear confidence and prediction intervals on parameters and predictions after regression calibration.
For the reviewer: Check whether predictions are reported with intervals; flag predictions given without uncertainty
Poeter, E.P., and Hill, M.C. (2007). MMA, a computer code for multi-model analysis. TM 6-E3. doi:10.3133/tm6e3
Ranks alternative calibrated models of the same system using AIC, AICc, BIC, and KIC, and computes model-averaged predictions.
For the reviewer: Compute AICc/BIC from weighted SSE and parameter count when alternative models are submitted
Tonkin, M.J., Tiedeman, C.R., Ely, D.M., and others (2007). OPR-PPR, a computer program for assessing data importance to model predictions using linear statistics. TM 6-E2. doi:10.3133/tm6e2
Linear statistics ranking how much existing or potential observations and parameter information reduce prediction uncertainty.
For the reviewer: Data-worth ranking from Jacobian: flag predictions dominated by a few observations or unconstrained parameters
Doherty, J.E., and Hunt, R.J. (2010). Approaches to highly parameterized inversion: a guide to using PEST for groundwater-model calibration. SIR 2010-5169. doi:10.3133/sir20105169
Practical guidance on regularized inversion: observation grouping and weighting, Tikhonov regularization, SVD/SVD-assist, and how to recognize overfitting.
For the reviewer: Parse PEST .rec/.pst: check balance of observation-group phi contributions, regularization settings, parameters at bounds
Fienen, M.N., Doherty, J.E., Hunt, R.J., and others (2010). Using prediction uncertainty analysis to design hydrologic monitoring networks: example applications from the Great Lakes water availability pilot project. SIR 2010-5159. doi:10.3133/sir20105159
Shows linear data-worth methods for ranking existing and potential observations by how much they reduce forecast uncertainty.
For the reviewer: Data-worth ranking for reviewer's "are observations relevant to forecasts?" check
Doherty, J.E., Fienen, M.N., and Hunt, R.J. (2011). Approaches to highly parameterized inversion: pilot-point theory, guidelines, and research directions. SIR 2010-5168. doi:10.3133/sir20105168
Theory and practical guidelines for pilot-point parameterization: spacing, regularization, and avoiding artifacts.
For the reviewer: Check pilot-point density vs observation density, presence of regularization, and "bullseye" K fields around observations
Niswonger, R.G., Panday, S., and Ibaraki, M. (2011). MODFLOW-NWT, a Newton formulation for MODFLOW-2005. TM 6-A37. doi:10.3133/tm6a37
Newton solver for drying and rewetting in unconfined models; explains convergence behavior and the effects of dry cells.
For the reviewer: Flag dry-cell counts, dry cells with boundary stresses, NWT convergence warnings
USGS Office of Groundwater (2015). Technical Memorandum 2015.02: Policy and guidelines for archival of surface-water, groundwater, and water-quality model applications. OGW Tech Memo 2015.02. link
Earlier cross-discipline model-archival policy and guidelines (rescission notice URL suggests it is also rescinded).
For the reviewer: Archive completeness check (secondary)
USGS Office of Groundwater (2016). Technical Memorandum 2016.02: Policy for documenting, archiving, and public release of numerical groundwater flow and transport models. OGW Tech Memo 2016.02. link
Policy requiring documented, archived, and publicly released models; now RESCINDED by WMA Policy Memo 2026.01 and kept for historical reference only.
For the reviewer: Archive completeness check (inputs, outputs, executables, metadata, readme)
USGS Office of Groundwater (2016). Documenting, archiving, and public release of numerical groundwater flow and transport models (companion website). web guidance. link
Companion site with the workflow (setup, prepare, review, release), archive structure, and QA/QC review of model archives before data release; marked historical.
For the reviewer: Encode archive structure and QA/QC review steps as automated checks
Langevin, C.D., Hughes, J.D., Banta, E.R., and others (2017). Documentation for the MODFLOW 6 Groundwater Flow Model. TM 6-A55. doi:10.3133/tm6a55
Documents the MODFLOW 6 GWF model: DIS/DISV/DISU grids, packages, budget reporting, and Newton/IMS solution controls.
For the reviewer: Check MF6 listing for budget % discrepancy, IMS outer/inner convergence, cell thickness/connection anomalies
Winston, R.B. (2018). ModelArchiver: a program for facilitating the creation of groundwater model archives. OFR 2017-1149. doi:10.3133/ofr20171149
Program that walks users step by step through assembling a model archive in the folder structure and with the metadata required by OGW policy 2016.02.
For the reviewer: Validate archive folder structure/readme/metadata against ModelArchiver layout
Halford, K.J. (2019). Evaluation of groundwater-flow models for estimating drawdown from proposed groundwater development in Tule Desert, Nevada. OFR 2019-1091. doi:10.3133/ofr20191091
Published USGS review comparing two consultant models; a real example of how USGS critiques model structure, boundaries, calibration, and drawdown predictions.
For the reviewer: judgment (template for review-report structure)
White, J.T., Hunt, R.J., Fienen, M.N., and others (2020). Approaches to highly parameterized inversion: PEST++ Version 5. TM 7-C26. doi:10.3133/tm7c26
Documents PEST++ tools: global sensitivity, GLM with FOSM, iterative ensemble smoother (IES), and data assimilation for history matching and forecast uncertainty.
For the reviewer: Ingest IES/GLM outputs: phi history, prior/posterior ensemble spread, prior-data conflict flags
Fienen, M.N., Schachter, L., and Hunt, R.J. (2025). A model uncertainty quantification protocol for evaluating the value of observation data. SIR 2025-5007. doi:10.3133/sir20255007
Step-by-step protocol for data-worth: add or remove observations within a history-matching framework and measure the change in forecast uncertainty.
For the reviewer: Implement add/remove-observation forecast-variance test as a scripted review module
USGS Office of Groundwater (n.d.). Model Archive Verification and Approval Form. form. link
Reviewer form for verifying a model archive before approval; linked from the OGW Technical Memoranda index page.
For the reviewer: Mirror form items as a machine-checkable archive checklist
Journal articles (61)
Konikow, L.F. (1986). Predictive accuracy of a ground-water model - lessons from a postaudit. Groundwater, 24(2), 173-184. doi:10.1111/j.1745-6584.1986.tb00993.x
Revisits a 1970s Arkansas Valley model prediction. Errors in projected pumping and recharge stresses, and in the conceptual model, outweighed calibration quality.
For the reviewer: Compare predictive stress-period inputs (WEL/RCH rates) with historical ranges and flag extrapolation beyond the calibration stresses
Freyberg, D.L. (1988). An exercise in ground-water model calibration and prediction. Groundwater, 26(3), 350-360. doi:10.1111/j.1745-6584.1988.tb00399.x
Classroom synthetic-aquifer experiment. A close head fit did not guarantee good predictions, and nonunique calibrations gave widely differing forecasts.
For the reviewer: Warn when the report infers prediction reliability from low head RMSE alone
Anderson, M.P.; Woessner, W.W. (1992). The role of the postaudit in model validation. Advances in Water Resources, 15(3), 167-173. doi:10.1016/0309-1708(92)90021-s
Reviews published post-audits. Prediction failures mostly trace back to a flawed conceptual model or wrong future stresses, not to parameter values. Argues post-audits should be routine.
For the reviewer: Check whether the archive contains a stated prediction period, stress assumptions and a post-audit plan or monitoring targets
Konikow, L.F.; Bredehoeft, J.D. (1992). Ground-water models cannot be validated. Advances in Water Resources, 15(1), 75-83. doi:10.1016/0309-1708(92)90033-x
Argues that "validation" is a misleading claim for groundwater models: history matching cannot prove a model is predictive. Recommends talking about calibration, testing and post-audit instead.
For the reviewer: judgment (a tool can flag report wording such as "validated model")
Stewart, M.; Langevin, C. (1999). Post audit of a numerical prediction of wellfield drawdown in a semiconfined aquifer system. Groundwater, 37(2), 245-252. doi:10.1111/j.1745-6584.1999.tb00980.x
Florida wellfield post-audit comparing predicted and observed drawdown. Misfits are attributed to how leakage and confining-unit behaviour were represented.
For the reviewer: Check confining-layer VKA/leakage terms in the budget against the drawdown residual pattern
Hill, M.C.; Tiedeman, C.R. (2002). Weighting observations in the context of calibrating groundwater models. IAHS Publication. link
Weighting terminology, setting weights from measurement error, and how weighting affects calibrated parameters and uncertainty measures.
For the reviewer: Flag uniform or unexplained weights; compare weights with stated measurement error
Kelson, V.A.; Hunt, R.J.; Haitjema, H.M. (2002). Improving a regional model using reduced complexity and parameter estimation. Groundwater. doi:10.1111/j.1745-6584.2002.tb02498.x
Case comparison showing a simpler model with parameter estimation can outperform a more complex one.
For the reviewer: judgment
Andersen, P.F.; Lu, S. (2003). A post audit of a model-designed ground water extraction system. Groundwater, 41(2), 212-218. doi:10.1111/j.1745-6584.2003.tb02584.x
Compares the capture performance of a remediation extraction system designed by modelling with later field behaviour. Shows where design-stage simplifications held up and where they failed.
For the reviewer: Check whether capture zones were tested with particle tracking under alternative parameter sets
Bredehoeft, J.D. (2003). From models to performance assessment: the conceptualization problem. Groundwater, 41(5), 571-577. doi:10.1111/j.1745-6584.2003.tb02395.x
Argues the conceptual model is the main source of predictive error, especially in long-horizon assessments. Calibration alone cannot reveal a wrong conceptualization.
For the reviewer: judgment (check that alternative conceptual models are documented)
Refsgaard, J.C.; Henriksen, H.J. (2004). Modelling guidelines - terminology and guiding principles. Advances in Water Resources, 27(1), 71-82. doi:10.1016/j.advwatres.2003.08.006
Proposes consistent terms (conceptual model, code, site model, verification, validation) and principles for quality assurance between modeller and reviewer.
For the reviewer: Map tool checks onto defined QA stages: code, construction, calibration, testing
Bredehoeft, J. (2005). The conceptualization model problem - surprise. Hydrogeology Journal, 13(1), 37-46. doi:10.1007/s10040-004-0430-5
Case histories where new data overturned accepted conceptual models. Advises reviewers to expect surprises and to keep collecting data that could falsify the model.
For the reviewer: judgment
Moore, C.; Doherty, J. (2005). Role of the calibration process in reducing model predictive error. Water Resources Research, 41(5), W05020. doi:10.1029/2004wr003501
Shows that calibration can leave large predictive error when a prediction depends on parameter combinations the observations do not inform.
For the reviewer: If a PEST Jacobian exists, compute prediction error variance before and after calibration
Refsgaard, J.C.; Henriksen, H.J.; Harrar, W.G.; and others (2005). Quality assurance in model based water management - review of existing practice and outline of new approaches. Environmental Modelling & Software, 20(10), 1201-1215. doi:10.1016/j.envsoft.2004.07.006
Compares national modelling guidelines and the HarmoniQuA QA framework. Recommends staged reviews with defined reviewer tasks and documentation at each modelling step.
For the reviewer: Generate a stage-by-stage review checklist report (setup, calibration, prediction)
Haitjema, H. (2006). The role of hand calculations in ground water flow modeling. Groundwater, 44(6), 786-791. doi:10.1111/j.1745-6584.2006.00189.x
Advocates analytical hand calculations to check numerical results and to decide where boundaries and resolution matter.
For the reviewer: Darcy/recharge-area sanity check: total recharge versus discharge, gradient x T x width versus the budget
Hill, M.C. (2006). The practical use of simplicity in developing ground water models. Groundwater, 44(6), 775-781. doi:10.1111/j.1745-6584.2006.00227.x
Argues for starting simple and adding complexity only when data and fit statistics justify it, with guidelines on weighted residuals and parameter statistics.
For the reviewer: Report adjustable parameters versus observations and whether added complexity improved the weighted fit
Jakeman, A.J.; Letcher, R.A.; Norton, J.P. (2006). Ten iterative steps in development and evaluation of environmental models. Environmental Modelling & Software, 21(5), 602-614. doi:10.1016/j.envsoft.2006.01.004
Ten-step good-practice cycle from purpose and data to calibration, testing, uncertainty and reporting. Widely used as a review template.
For the reviewer: Check the report contains each of the ten elements
Hunt, R.J.; Doherty, J.; Tonkin, M.J. (2007). Are models too simple? Arguments for increased parameterization. Groundwater, 45(3), 254-262. doi:10.1111/j.1745-6584.2007.00316.x
Counterpoint to parsimony: few zones can bias predictions and understate uncertainty. Recommends many parameters with regularization.
For the reviewer: Flag uniform or very few K zones in a large model and check whether regularization was used
Refsgaard, J.C.; van der Sluijs, J.P.; Hojberg, A.L.; and others (2007). Uncertainty in the environmental modelling process - a framework and guidance. Environmental Modelling & Software, 22(11), 1543-1556. doi:10.1016/j.envsoft.2007.02.004
Framework for classifying uncertainty sources and choosing methods at each modelling stage, including uncertainty in model structure.
For the reviewer: Check the report has an uncertainty-source table (inputs, parameters, structure, scenario)
Tiedeman, C.R.; Hill, M.C. (2007). Model calibration and issues related to validation, sensitivity analysis, post-audit, uncertainty evaluation and assessment of prediction data needs. Book chapter (Springer). doi:10.1007/978-1-4020-5729-8_9
Synthesis of calibration practice and related evaluation topics: validation limits, sensitivity, post-audits and prediction data needs.
For the reviewer: judgment
Rojas, R.; Feyen, L.; Dassargues, A. (2008). Conceptual model uncertainty in groundwater modeling: combining GLUE and Bayesian model averaging. Water Resources Research, 44(12), W12418. doi:10.1029/2008wr006908
Weights alternative conceptual models by likelihood and shows that relying on one model understates predictive uncertainty.
For the reviewer: Check whether more than one conceptual model or a model-averaging step is documented
Doherty, J.; Hunt, R.J. (2009). Two statistics for evaluating parameter identifiability and error reduction. Journal of Hydrology, 366(1-4), 119-127. doi:10.1016/j.jhydrol.2008.12.018
Introduces parameter identifiability and relative error-variance reduction, computed from the Jacobian, to show which parameters the observations constrain.
For the reviewer: Compute identifiability from the PEST .jco and flag estimated parameters with identifiability below about 0.1
Dausman, A.M.; Doherty, J.; Langevin, C.D.; and others (2010). Quantifying data worth toward reducing predictive uncertainty. Groundwater, 48(5), 729-740. doi:10.1111/j.1745-6584.2010.00679.x
Uses linear analysis on a variable-density model to rank existing and potential observations by how much they reduce uncertainty in a specific prediction.
For the reviewer: Data-worth ranking of observation groups (pyEMU-style) when a Jacobian is available
Doherty, J.; Welter, D. (2010). A short exploration of structural noise. Water Resources Research, 46(5), W05525. doi:10.1029/2009wr008377
Shows that model structural error produces spatially and temporally correlated residuals that behave like noise; overfitting them corrupts parameters.
For the reviewer: Test residual autocorrelation (Moran's I in space, lag-1 in time) and warn about overfitting
Lemke, L.D.; Cypher, J.A. (2010). Postaudit evaluation of conceptual model uncertainty for a glacial aquifer groundwater flow and contaminant transport model. Hydrogeology Journal, 18(4), 945-958. doi:10.1007/s10040-009-0554-8
Post-audit of a glacial-aquifer flow and transport model showing how conceptual (stratigraphic) choices drove forecast error.
For the reviewer: judgment
Dixon, M.F.; Bai, Z.; Brush, C.F.; and others (2011). Error control of iterative linear solvers for integrated groundwater models. Groundwater, 49(6), 859-865. doi:10.1111/j.1745-6584.2010.00786.x
Links the linear-solver residual tolerance to the actual solution error and shows loose tolerances can hide error.
For the reviewer: Flag RCLOSE/HCLOSE that are loose relative to cell flows; check budget discrepancy (implemented)
Doherty, J.; Christensen, S. (2011). Use of paired simple and complex models to reduce predictive bias and quantify uncertainty. Water Resources Research, 47(12), W12534. doi:10.1029/2011wr010763
Pairs a fast simple model with a complex model to diagnose and correct predictive bias caused by simplification.
For the reviewer: judgment
Konikow, L.F. (2011). The secret to successful solute-transport modeling. Groundwater, 49(2), 144-159. doi:10.1111/j.1745-6584.2010.00764.x
Reviews pitfalls of transport modelling: numerical dispersion and oscillation, grid and time-step choice, dispersivity scale, heterogeneity; get the flow field right first.
For the reviewer: Compute grid Peclet and Courant numbers and flag Pe>2 or Cr>1
Voss, C.I. (2011). Editor's message: Groundwater modeling fantasies - part 1, adrift in the details. Hydrogeology Journal, 19(7), 1281-1284. doi:10.1007/s10040-011-0789-z
Editorial criticizing over-detailed models that give a false sense of accuracy; calls for purpose-driven simplification (part 2: 10.1007/s10040-011-0790-6).
For the reviewer: judgment
Gupta, H.V.; Clark, M.P.; Vrugt, J.A.; and others (2012). Towards a comprehensive assessment of model structural adequacy. Water Resources Research, 48(8), W08301. doi:10.1029/2011wr011044
Framework for judging structural adequacy using diagnostic signatures and hypothesis testing rather than aggregate fit alone.
For the reviewer: Report diagnostics for heads, flows and hydrographs separately, not one objective function
Bennett, N.D.; Croke, B.F.W.; Guariso, G.; and others (2013). Characterising performance of environmental models. Environmental Modelling & Software, 40, 1-20. doi:10.1016/j.envsoft.2012.09.011
Catalogue of quantitative performance metrics (residual, correlation, frequency-domain, spatial) and a five-step evaluation procedure.
For the reviewer: Metric suite: ME, MAE, RMSE, scaled RMSE, NSE, bias by layer and zone, residual maps
Doherty, J.; Simmons, C.T. (2013). Groundwater modelling in decision support: reflections on a unified conceptual framework. Hydrogeology Journal, 21(7), 1531-1537. doi:10.1007/s10040-013-1027-7
Frames models as decision-support tools whose job is to quantify and reduce uncertainty in decision-relevant predictions.
For the reviewer: Check that decision-relevant predictions are named and given with uncertainty
Post, V.E.A.; von Asmuth, J.R. (2013). Review: Hydraulic head measurements - new technologies, classic pitfalls. Hydrogeology Journal, 21(4), 737-750. doi:10.1007/s10040-013-0969-0
Reviews head-measurement error sources (datum, density, barometric and logger drift, well construction) that limit achievable calibration fit.
For the reviewer: Check implied head error (1/weight) is not smaller than plausible measurement error
White, J.T.; Doherty, J.E.; Hughes, J.D. (2014). Quantifying the predictive consequences of model error with linear subspace analysis. Water Resources Research, 50(2), 1152-1173. doi:10.1002/2013wr014767
Shows when calibration-induced parameter compensation for model defects biases particular predictions.
For the reviewer: judgment (pyEMU-based check if a Jacobian is available)
Bakker, M.; Post, V.; Langevin, C.D.; and others (2016). Scripting MODFLOW model development using Python and FloPy. Groundwater, 54(5), 733-739. doi:10.1111/gwat.12413
Promotes script-based, reproducible MODFLOW model construction with FloPy.
For the reviewer: Check the archive for build scripts and environment files
Hill, M.C.; Kavetski, D.; Clark, M.; and others (2016). Practical use of computationally frugal model analysis methods. Groundwater, 54(2), 159-170. doi:10.1111/gwat.12330
Argues that cheap local methods (composite scaled sensitivity, parameter correlation, leverage) give most of the diagnostic value.
For the reviewer: Compute CSS, parameter correlation (flag abs(r)>0.95) and leverage from the Jacobian
White, J.T.; Fienen, M.N.; Doherty, J.E. (2016). A python framework for environmental model uncertainty analysis. Environmental Modelling & Software, 85, 217-228. doi:10.1016/j.envsoft.2016.08.017
pyEMU: open-source first-order and nonlinear uncertainty analysis, identifiability and data worth for PEST-based models.
For the reviewer: Library that a review tool could call for identifiability and forecast variance
Ferre, T.P.A. (2017). Revisiting the relationship between data, models, and decision-making. Groundwater, 55(5), 604-614. doi:10.1111/gwat.12574
Argues for multi-model ensembles framed around the decision and for data that discriminates between competing hypotheses.
For the reviewer: judgment
Guthke, A. (2017). Defensible model complexity: a call for data-based and goal-oriented model choice. Groundwater, 55(5), 646-650. doi:10.1111/gwat.12554
Proposes that model complexity be justified by both data support and the prediction goal.
For the reviewer: Check whether complexity choices are justified in the report
Peeters, L.J.M. (2017). Assumption hunting in groundwater modeling: find assumptions before they find you. Groundwater, 55(5), 665-669. doi:10.1111/gwat.12565
Recommends systematically listing every modelling assumption and stating its likely effect on predictions.
For the reviewer: Auto-extracted assumptions register (boundary types, uniform parameters, steady state) for the modeller to annotate
White, J.T. (2017). Forecast first: an argument for groundwater modeling in reverse. Groundwater, 55(5), 660-664. doi:10.1111/gwat.12558
Argues for defining forecasts first and designing model detail, calibration and uncertainty analysis around them.
For the reviewer: Check that forecasts are explicitly defined
Enemark, T.; Peeters, L.J.M.; Mallants, D.; and others (2019). Hydrogeological conceptual model building and testing: a review. Journal of Hydrology, 569, 310-329. doi:10.1016/j.jhydrol.2018.12.007
Reviews how conceptual models are built, tested and compared; alternative conceptual models are rarely considered.
For the reviewer: judgment
Jazayeri, A.; Werner, A.D. (2019). Boundary condition nomenclature confusion in groundwater flow modeling. Groundwater, 57(5), 664-668. doi:10.1111/gwat.12893
Documents inconsistent naming of boundary-condition types and how it misleads reviewers; proposes clearer terminology.
For the reviewer: List each boundary package with its mathematical type and flux totals
Saltelli, A.; Aleksankina, K.; Becker, W.; and others (2019). Why so many published sensitivity analyses are false: a systematic review of sensitivity analysis practices. Environmental Modelling & Software, 114, 29-39. doi:10.1016/j.envsoft.2019.01.012
Finds most published sensitivity analyses vary one factor at a time and miss interactions in nonlinear models; recommends global methods.
For the reviewer: Flag when the only sensitivity analysis is one-at-a-time
Doherty, J.; Moore, C. (2020). Decision support modeling: data assimilation, uncertainty quantification, and strategic abstraction. Groundwater, 58(3), 327-337. doi:10.1111/gwat.12969
Decision-support models should assimilate data and quantify uncertainty, simplifying only where this does not bias decision-critical predictions.
For the reviewer: judgment
Hunt, R.J.; Fienen, M.N.; White, J.T. (2020). Revisiting "An exercise in groundwater model calibration and prediction" after 30 years: insights and new directions. Groundwater, 58(2), 168-182. doi:10.1111/gwat.12907
Revisits the Freyberg exercise with modern methods; good fits can still give biased forecasts unless uncertainty is quantified.
For the reviewer: Check whether forecasts are reported with prior and posterior uncertainty
White, J.T.; Knowling, M.J.; Moore, C.R. (2020). Consequences of groundwater-model vertical discretization in risk-based decision-making. Groundwater, 58(5), 695-709. doi:10.1111/gwat.12957
Shows coarse vertical layering can bias some decision-relevant outputs (streamflow depletion, nitrate) while leaving others unaffected.
For the reviewer: Flag thick layers relative to well screens and stream beds when vertical gradients matter
White, J.T.; Foster, L.K.; Fienen, M.N.; and others (2020). Towards reproducible environmental modeling for decision support: a worked example. Frontiers in Earth Science, 8, 50. doi:10.3389/feart.2020.00050
Fully scripted, reproducible workflow for parameter estimation and uncertainty quantification on an existing groundwater model.
For the reviewer: Check for scripted, reproducible workflow artifacts in the archive
Fienen, M.N.; Corson-Dosch, N.T.; White, J.T.; and others (2022). Risk-based wellhead protection decision support: a repeatable workflow approach. Groundwater, 60(1), 71-86. doi:10.1111/gwat.13129
Demonstrates a scripted, repeatable MODFLOW 6 / PEST++ workflow delivering probabilistic capture zones.
For the reviewer: Check the archive contains scripts, PEST control files and ensemble outputs
Flinders, A.F.; Kauahikaua, J.P.; Hsieh, P.A.; and others (2022). Post audit of simulated groundwater flow to a short-lived (2019 to 2020) crater lake at Kilauea Volcano. Groundwater, 60(1), 64-70. doi:10.1111/gwat.13133
Recent post-audit comparing modelled filling of the Halemaumau crater lake with the observed rise.
For the reviewer: Store dated forecast outputs so they can be audited later
Zipper, S.; Befus, K.M.; Reinecke, R.; and others (2023). GroMoPo: a groundwater model portal for findable, accessible, interoperable, and reusable (FAIR) modeling. Groundwater, 61(6), 764-767. doi:10.1111/gwat.13343
Community portal for archiving and finding groundwater models under FAIR principles.
For the reviewer: Check FAIR metadata (code version, spatial reference, units, licence) in the archive
Fienen, M.N.; White, J.T.; Hayek, M. (2024). Parameter ESTimation with the Gauss-Levenberg-Marquardt algorithm: an intuitive guide. Groundwater. doi:10.1111/gwat.13433
Graphical explanation of Gauss-Levenberg-Marquardt tuning parameters and how objective-function construction affects calibration.
For the reviewer: Inspect lambda/phi trajectories in PEST records for stalled runs
Kamali Maskooni, E.; Werner, A.D.; Solorzano-Rivas, S.C. (2024). Groundwater modelling reports fail to comply with guideline recommendations for model reproducibility. Journal of Environmental Management, 355, 120292. doi:10.1016/j.jenvman.2024.120292
Audits consultant modelling reports against guideline reproducibility items; most omit key information, so results cannot be reproduced.
For the reviewer: Reproducibility checklist: code version, input files, run instructions, budget, observation files
Farnum, T.; Leaf, A.T.; Fienen, M.N. (2025). PEST++IES how many iterations and realizations, finding the point of diminishing returns. Groundwater. doi:10.1111/gwat.70018
Examines how ensemble size and iteration count affect iterative-ensemble history matching and the uncertainty estimate.
For the reviewer: Flag small ensembles or ensemble collapse in PEST++ IES outputs
Afzal, N.; Zwickle, A.; Zipper, S.; Wardropper, C.B. (2026). Trust, uncertainty, and the use of groundwater models in the Southern High Plains Aquifer (USA). Groundwater, early view, article gwat.70127. doi:10.1111/gwat.70127 new
Interview study of producers, policy staff and modellers using a Kansas groundwater management model; trust in both model and modeller drives use, and users want transparent statements of uncertainty and limitations.
For the reviewer: Check that the report has an explicit limitations and uncertainty section written for non-specialist users
Bai, Y.; Li, Z.; Ru, Q.; and others (2026). Uncertainty analysis of elevation data based on groundwater modeling system: a case study of Zhaozhou County, China. Journal of Groundwater Science and Engineering, 14(4), 582-600. doi:10.26599/jgse.2026.9280096 new
Compares model top surfaces from a DEM and from sparse borehole interpolation; smoothed borehole surfaces distorted unsaturated thickness and cut simulated evapotranspiration by up to 93 percent, while both models still passed conventional head-fit criteria.
For the reviewer: Compare model top with a DEM and flag large differences, especially where ET or drains depend on depth below land surface; report NSE as well as RMSE
Li, W.; He, C.; Sun, H.; and others (2026). Groundwater recovery targets and the identifiability of irreversible compaction in layered aquitards. Sustainability, 18(22), 11604. doi:10.3390/su182211604 new
Synthetic tests (3000 fits) and a field case show that net extensometer data poorly identify which aquitard layer compacts irreversibly; initial-state and storage parameters compensate, giving different forecasts at similar calibration fit.
For the reviewer: For SUB/CSUB models, flag high correlation between preconsolidation head and inelastic storage parameters and recommend layer-specific deformation observations
Muffels, C. (2026). Not faster, but better: experience and guidelines from a year of AI use in groundwater modeling. Groundwater, early view. doi:10.1111/gwat.70128
Practitioner account of a staged plan-critique-implement workflow using AI language models in groundwater modelling, with usage guidelines.
For the reviewer: Design hint for AI-assisted review: separate critic and implementer roles
Ou, G.; Wang, Z. (2026). makePst: a reproducible and auditable spreadsheet workflow for PEST model calibration. Groundwater, early view, article gwat.70118. doi:10.1111/gwat.70118 new
Command-line tool that builds and validates PEST-family control files from spreadsheet calibration records, compares control files semantically, tracks provenance and writes calibration results back to the workbook.
For the reviewer: Validate the PEST control file (parameter bounds, groups, observation weights) and diff it against an earlier archived version as an audit trail
Pleasants, M.S.; Fienen, M.N.; Essaid, H.I.; and others (2026). A demonstrated workflow to efficiently identify better performing process-based model configurations. Water Resources Research, 62(11), e2026WR044356. doi:10.1029/2026wr044356 new
USGS-led study that screens competing model configurations before calibration by comparing prior-ensemble outputs with observed data using a Mahalanobis-distance prior-data-conflict metric that also penalizes complexity; demonstrated on 96 PRMS configurations and confirmed with PEST++ IES calibration. Transferable to choosing among alternative MODFLOW conceptualizations.
For the reviewer: From a PEST++ prior ensemble (as few as about 25 realizations), compute Mahalanobis distance of observations from the prior output distribution per observation group and flag prior-data conflict before calibration
Schmid, W.; Dela Cruz, A.; Siade, A.; and others (2026). Managed aquifer recharge operations and design under hydrologic uncertainty. Groundwater, early view, article gwat.70105. doi:10.1111/gwat.70105 new
Uses a dual ensemble (operating scenarios crossed with IES parameter realizations) to express managed-recharge impacts as probabilities of exceeding stakeholder thresholds; climate scenario dominated predictive uncertainty.
For the reviewer: From IES ensemble outputs, report the probability that each forecast exceeds its stated decision threshold, and flag scenarios evaluated on a single realization
Tian, J.; Zeng, X.; Pan, Y.; and others (2026). A data-driven method coupling multiple physical constraints for correcting structural errors in groundwater contaminant transport models. Hydrology and Earth System Sciences, 30(20), 6459-6479. doi:10.5194/hess-30-6459-2026 new
Proposes a data-driven correction for structural error in reactive transport models that combines several physical constraints in a weighted likelihood; constraints act like extra observations and reduce parameter compensation and predictive uncertainty.
For the reviewer: judgment (supports a check that transport-model residuals are examined for systematic structural bias before parameters are trusted)
Guidelines and standards (33)
ASTM International, Subcommittee D18.21 (1993, reapproved 2014 (withdrawn 2023)). Standard Guide for Comparing Groundwater Flow Model Simulations to Site-Specific Information. ASTM D5490-93(2014)e1. link
Techniques for comparing simulated heads and flows with measurements: residual statistics, residual maps, simulated-versus-observed plots, flow and mass-balance comparisons.
For the reviewer: Residual statistics, 1:1 plots, residual maps, flux targets (implemented); residual autocorrelation (candidate)
ASTM International, Subcommittee D18.21 (1994, reapproved 2014 (withdrawn 2023)). Standard Guide for Defining Initial Conditions in Groundwater Flow Modeling. ASTM D5610-94(2014). link
Selecting initial heads for steady and transient runs, including steady-state starting conditions and testing sensitivity to them.
For the reviewer: Flag large head changes in the first transient period (initial-condition drift)
ASTM International, Subcommittee D18.21 (1994, reapproved 2016 (withdrawn 2025)). Standard Guide for Conducting a Sensitivity Analysis for a Groundwater Flow Model Application. ASTM D5611-94(2016). link
Varying calibrated inputs and classifying sensitivity by whether calibration and predictions change significantly.
For the reviewer: Classify parameters by calibration and prediction sensitivity from perturbation runs or a PEST Jacobian
U.S. EPA, Office of Solid Waste and Emergency Response (1994). Assessment Framework for Ground-Water Model Applications. EPA 500-B-94-003. link
Framework of review questions for judging whether a groundwater model application suits its regulatory purpose.
For the reviewer: judgment; review-question wording
U.S. EPA, Office of Solid Waste and Emergency Response (1994 (2nd edition)). Ground-Water Modeling Compendium: Model Fact Sheets, Description, Applications and Cost Guidelines. EPA 500-B-94-004. link
Historical compendium of model fact sheets, applications and cost guidance.
For the reviewer: judgment
U.S. EPA, with U.S. DOE and U.S. NRC (1994). A Technical Guide to Ground-Water Model Selection at Sites Contaminated with Radioactive Substances. EPA 402-R-94-012. link
Choosing flow and transport codes to match site conditions, processes and the decision context.
For the reviewer: Compare required processes with the code and packages used
ASTM International (1995, reapproved 2006 (withdrawn 2015)). Standard Guide for Subsurface Flow and Transport Modeling. ASTM D5880-95(2006). link
Overview of the ASTM family of flow and transport modelling guides.
For the reviewer: judgment
ASTM International (1996, reapproved 2008 (withdrawn 2017)). Standard Guide for Developing and Evaluating Groundwater Modeling Codes. ASTM D6025-96(2008). link
Code quality assurance: verification against analytical solutions and benchmarks, testing and documentation.
For the reviewer: Record code and executable version (partly implemented for FloPy)
U.S. EPA, with U.S. DOE and U.S. NRC (1996). Documenting Ground-Water Modeling at Sites Contaminated with Radioactive Substances. EPA 540-R-96-003. link
Interagency guidance on what site modelling reports should document, from objectives to limitations.
For the reviewer: Report-completeness checklist
Van Waveren, R.H., Groot, S., Scholten, H., and others; Rijkswaterstaat RIZA and STOWA (Netherlands) (1999). Good Modelling Practice Handbook (Vloeiend modelleren in het waterbeheer). RIZA 99.036; STOWA 99-05; ISBN 9057730561. link
Generic water-modelling QA handbook with step-by-step checklists over the project life cycle.
For the reviewer: Model journal/audit-trail requirement maps to a run-log and version-control check
Entec UK Ltd for the Environment Agency (England and Wales) (2001). Guide to good practice for the development of conceptual models and the selection and application of mathematical models of contaminant transport processes in the subsurface. EA report NC/99/38/2. link
Good-practice guide for conceptual site models and contaminant transport model selection; appendices cover Peclet and Courant numbers.
For the reviewer: Grid Peclet and Courant number check for transport models
Environment Agency (England and Wales) (2001). Guidance on the assessment and interrogation of subsurface analytical contaminant fate and transport models. EA report NC/99/38/1. link
Guidance for regulator staff on interrogating fate and transport model submissions (analytical models).
For the reviewer: judgment
Pattle Delamore Partners Ltd, for the New Zealand Ministry for the Environment (2002). Groundwater Model Audit Guidelines. link
Auditor-oriented framework for judging how valid and uncertain a groundwater model's predictions are.
For the reviewer: Audit-question list as reviewer prompts
Environment Agency (England and Wales) (2004). Environment Agency framework for groundwater resources: conceptual and numerical modelling. EA R&D Technical Report W214. link
Framework for regional conceptual and numerical groundwater-resource models, with a review of international modelling guidelines.
For the reviewer: judgment
National Research Council (2007). Models in Environmental Regulatory Decision Making. doi:10.17226/11972. doi:10.17226/11972
Life-cycle model evaluation (peer review, corroboration, sensitivity and uncertainty, retrospective analysis) and parsimony for regulatory models; basis for the EPA 2009 guidance.
For the reviewer: judgment; supports a post-audit check
Nevada Bureau of Land Management (2008). Groundwater Modeling Guidance for Mining Activities. BLM IM NV-2008-035, Attachment 1. link
What groundwater models for mine environmental analyses should include and document.
For the reviewer: Report and archive presence checks
U.S. EPA, Council for Regulatory Environmental Modeling (2009). Guidance on the Development, Evaluation, and Application of Environmental Models. EPA/100/K-09/003. link
Non-binding EPA guidance for regulatory models: development, evaluation and application, with peer review, QA plans, sensitivity and uncertainty analysis, transparency and parsimony.
For the reviewer: judgment; top-level QA categories
Barnett, B., Townley, L.R., Post, V., and others; National Water Commission (Australia) (2012). Australian groundwater modelling guidelines. Waterlines Report Series No. 82. link
National best-practice guide covering the model life cycle, with confidence-level classes and compliance and review checklists.
For the reviewer: Encode its review checklist as rule items; scaled RMS and mass-balance discrepancy (it suggests <1%); flag prediction periods much longer than the calibration period
Wels, C., Mackie, D., and Scibek, J., for the British Columbia Ministry of Environment (2012). Guidelines for Groundwater Modelling to Assess Impacts of Proposed Natural Resource Development Activities. link
Provincial guidance for impact-assessment models (mining, large extractions), with summary points per section.
For the reviewer: Use section summary points as review rules
ASTM International, Subcommittee D18.21 (2013 (withdrawn 2022)). Standard Guide for Documenting a Groundwater Flow Model Application. ASTM D5718-13. link
Components to document and archive, including logs and input/output for significant simulations.
For the reviewer: Archive-completeness checklist: inputs, outputs, listing files and run logs for every reported run
Sinclair Knight Merz, for the National Water Commission (Australia) (2013). Companion to the Australian Groundwater Modelling Guidelines. link
Condensed summary of the 2012 guidelines for managers and reviewers, restating key steps, confidence classes and review expectations.
For the reviewer: judgment; plain-language reviewer prompts
ASTM International, Subcommittee D18.21 (2016 (withdrawn 2025)). Standard Guide for Defining Boundary Conditions in Groundwater Flow Modeling. ASTM D5609-16. link
Boundary types and how to place them so they reflect the system and do not artificially control the solution.
For the reviewer: Flag specified-head cells close to stresses and report each boundary's budget share
ASTM International, Subcommittee D18.21 (2017 (withdrawn 2026)). Standard Guide for Application of a Numerical Groundwater Flow Model to a Site-Specific Problem. ASTM D5447-17. link
Umbrella guide to the steps of applying a groundwater flow model to a site, from objectives to documentation.
For the reviewer: judgment; workflow skeleton for organising checks
ASTM International (2017 (withdrawn 2026)). Standard Guide for Selecting a Groundwater Modeling Code. ASTM D6170-17. link
Matching code capabilities to objectives and the processes in the conceptual model.
For the reviewer: Flag process mismatches, e.g. widespread drying without a Newton formulation (implemented in solver advice)
ASTM International, Subcommittee D18.21 (2018 (active)). Standard Guide for Calibrating a Groundwater Flow Model Application. ASTM D5981/D5981M-18. link
Manual and automated calibration, calibration targets and acceptance criteria, and checking that calibrated parameters are reasonable.
For the reviewer: Check targets and acceptance criteria are stated; compare calibrated K, Ss, recharge with plausible ranges; flag parameters at bounds
Middlemis, H., and Peeters, L.J.M.; Independent Expert Scientific Committee (IESC, Australia) (2018 (updated 2019; superseded)). Information Guidelines Explanatory Note - Uncertainty analysis: guidance for groundwater modelling within a risk management framework. IESC explanatory note. link
Uncertainty analysis as essential for risk-based decisions, with a range of methods and transparent reporting of predictive uncertainty.
For the reviewer: Flag reports with only single-value predictions; look for uncertainty products in the archive
Texas Water Development Board (2020). Guidelines to Submit Model Runs. link
Requirements for submitting model runs and non-GAM models to the TWDB.
For the reviewer: Archive-completeness check for run packages
Nevada Division of Environmental Protection, Bureau of Mining Regulation and Reclamation (2021). Guidance for Hydrogeologic Groundwater Flow Modeling at Mine Sites. Rev 00. link
State guidance and fillable submittal form for mine-site groundwater flow models.
For the reviewer: Form fields as structured review items
NSW Department of Planning and Environment (Stantec) (2022). Minimum Groundwater Modelling Requirements for State Significant Development/State Significant Infrastructure Projects. ISBN 9781760585198. link
Regulator's minimum expectations and reporting requirements for groundwater models supporting major-project applications.
For the reviewer: Map each minimum requirement to an archive or report presence check
NSW Department of Planning and Environment (EMM Consulting) (2022). Guidelines for Groundwater Documentation for SSD/SSI Projects - Technical guideline. ISBN 9781760585211. link
Documentation and data a groundwater impact assessment for major projects must supply.
For the reviewer: Presence checks on a submission package
Peeters, L.J.M., and Middlemis, H.; IESC (Australia) (2023 (current edition)). Information Guidelines Explanatory Note - Uncertainty analysis for groundwater modelling. IESC explanatory note. link
Revised guidance on choosing and justifying uncertainty-analysis approaches for different risk contexts, for proponents and regulators.
For the reviewer: Check predictions are reported as intervals or probabilities against thresholds
Texas Water Development Board (2024 (March revision)). GAM Standards. link
Standards for building, calibrating, reporting and releasing Texas groundwater availability models.
For the reviewer: Deliverable presence and format checks
California State Water Resources Control Board, Land Disposal Program (web page (updated 2018)). Evaluation of Ground Water Model Applications. link
Regulator evaluation approach separating code development from site application, warning that calibration alone does not validate a model.
For the reviewer: judgment; post-audit check